User Tools

Site Tools


prolineconcepts:fdrestimator

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
prolineconcepts:fdrestimator [2013/10/01 11:46]
132.168.72.53
prolineconcepts:fdrestimator [2013/11/27 15:41] (current)
193.48.0.3
Line 1: Line 1:
 ====== FDR Estimation ====== ====== FDR Estimation ======
  
-There are many ways to calculate FDR. Proline ​implements few of them :+There are several ​ways to calculate FDR depending on the database search typeIn Proline ​the FDR is calculated at peptide and protein levels using the following rules: 
 +  * if the Search has been done on a concatenated Target/​Decoy bank, FDR =  2 * nbr DecoyPSM / (nbr TargetPSM + bnr DecoyPSM ). Note: when computing PSM FDR, peptide sequences matching a Target Protein and a Decoy Protein is taken into account in both cases. 
 +  * if the Search has been done on a separated Target/​Decoy bank, FDR = nbr DecoyPSM ​ / nbr TargetPSM.
  
-===== Peptide Spectrum Matches FDR estimation ===== 
- 
-  * Default Estimator. The FDR is calculated using following rule 
-    * if Search have been done on a concatenated Target/​Decoy bank, FDR =  2 * nbr DecoyPSM / (nbr TargetPSM + bnr DecoyPSM ). PeptideMatches that matches a Target Protein and a Decoy Protein will be count in both case. 
-    * if Search have been done on a separated Target/​Decoy bank, FDR =   nbr DecoyPSM ​ / nbr TargetPSM. ​ 
-  * Competition Based FDR Estimator : Uses FDR described in Navarro et al. (JPR, 2009)  
-    * TO BE DESCRIBED 
- 
-===== Protein FDR estimation ===== 
- 
-FIXME to be described FIXME 
prolineconcepts/fdrestimator.1380620810.txt.gz · Last modified: 2013/10/01 11:46 by 132.168.72.53